There is a point on almost every residential project where the same question comes up: how much is this actually going to cost? It is usually one of the biggest investments someone will make in their home, so it is completely understandable that cost becomes a major concern early on. Nobody wants to spend months developing a design only to discover later that it sits nowhere near the available budget. The instinct, therefore, is often to get a builder involved as soon as there is something tangible to look at. A concept has been drawn, the planning package is taking shape and there is enough information to understand the general size and form of the project. At that point, why not send it out and ask for a price? One side of the office argues that this is exactly what you should do. The other side asks a slightly awkward question: what, exactly, are they pricing? That is where this month’s Office Debate starts.
The argument for pricing early
There is a very sensible case for getting some idea of cost as early as possible because design cannot exist completely independently of budget. You can develop the perfect extension, resolve every junction, specify every finish and spend months producing technical information, but if the finished scheme costs twice what the client can afford, something has gone wrong much earlier in the process. An early conversation with a builder can be incredibly useful. They may identify an expensive structural move, an awkward sequence of construction or a detail that looks relatively straightforward on paper but is going to require considerably more labour on site. They also understand what is happening in the market at that point in time. Material costs move, labour availability changes and certain forms of construction become more or less economical, so a good contractor can bring practical knowledge that helps keep a project grounded. There is also another important reason to talk about money early. It gives everyone the opportunity to adjust while the project is still fluid. If an initial design appears to be heading beyond the budget, it is much easier to respond while the scheme is still being developed than once planning has been approved and the client has become emotionally invested in every part of it. The extension might become slightly smaller, a particularly complex piece of structure might be reconsidered or the expensive element might be retained because it is fundamental to the architecture, while savings are found somewhere less important. That can be a very healthy part of the design process.
But is an early price really a price?
This is where the other side of the debate starts to push back. At an early stage, a builder may understand the size, form and general intention of a project, but they often do not yet have all the information required to price exactly how it is going to be built. The structural design might not exist yet. Drainage routes may still need resolving. The glazing specification may not have been decided. The insulation build-up could change. Joinery, lighting, finishes, sanitaryware, heating systems and external works might still be little more than assumptions. Even relatively basic questions can have large cost implications once the detail starts to develop. Is that opening supported by one beam or a more complicated arrangement of steelwork? Does the existing drainage need diverting? Are the windows standard sizes or bespoke? Is the floor polished concrete, timber, stone or something else entirely? Is landscaping included? What level of decoration has been allowed for? Suddenly a seemingly simple question such as “How much will this cost?” becomes considerably harder to answer with any real certainty. A builder can still provide a number, of course. The important thing is that the number contains assumptions, and the earlier the project is in its development, the more assumptions are likely to be sitting behind it.
A budget, an estimate and a price are not the same thing
Part of the confusion comes from the language we use. Clients understandably hear a figure and think of it as the cost, but there is a big difference between an early budget allowance and a detailed construction price. At concept stage, you may simply be trying to establish whether a project is broadly a £100,000 exercise or a £300,000 one. That is enormously useful information because it helps everyone understand whether the brief, ambition and available budget are broadly aligned. What it does not necessarily tell you is whether the finished project will cost £187,450. The difficulty is that early estimates can sometimes create exactly that impression. A very specific-looking number feels authoritative and settled. Months later, when the technical design has developed and the price changes, the natural reaction is to ask why it has gone up. Sometimes the answer is not that the project has suddenly become more expensive. It is simply that more of the project has now been properly defined.
The danger of comparing numbers rather than scope
This becomes particularly interesting when several builders price the same early set of drawings. One comes back at £180,000, another at £210,000 and another at £235,000. The immediate temptation is obvious. The first builder appears to be cheaper. But are they actually pricing the same thing? One contractor may have included drainage diversions, steelwork, external works, decoration and a realistic allowance for the glazing. Another may have excluded half of those items or made much simpler assumptions. One may be allowing for a relatively high-quality finish while another is working from a more basic specification. Neither contractor is necessarily doing anything wrong. They are simply filling in the gaps in the information differently. That means the client may not really be comparing three prices for the same project. They may be comparing three subtly different versions of it. This is why the cheapest quote is not always the cheapest project. The omissions do not disappear. They often return later as variations.
So should builders be involved early?
We think so, but there is a difference between involving a builder early and expecting a fixed construction price early. Those two things often get confused. Early contractor input can be incredibly valuable. Ask whether a particular structural approach feels sensible. Discuss access. Talk about sequencing. Get an indication of where the expensive parts of the scheme might be. Test the overall budget. That information can improve the design and help keep the project realistic. What becomes problematic is when an early figure is treated as though it carries the same level of certainty as a quotation based on developed technical information. It simply cannot, because there is still too much to be decided.
Does planning approval mean a project is ready to price?
This is another point we regularly come across. Planning permission feels like a significant milestone because it is. The form, size, appearance and relationship of the proposed development have been established, but planning drawings are produced primarily to explain the proposal to the planning authority. They are not necessarily intended to tell a contractor every detail required to construct it. There can still be a considerable amount of work between planning approved and ready to build. Structure, construction build-ups, junctions, weathering, drainage, Building Regulations, services and specification all begin to replace assumptions with actual information, and as that happens, pricing becomes more meaningful.
But waiting too long has its own risk
There is an opposite extreme, too. If everything is developed in enormous detail before anyone seriously looks at cost, a different problem can emerge. The design becomes fixed, the client becomes attached to it, planning may already be secured and technical work has been completed. Then the tender returns and everybody discovers that the project is significantly over budget. At that stage, reducing cost is much harder. It can involve redesign, revised technical information and potentially even another planning application. So simply saying that nothing should be priced until everything is finished is not especially helpful either. Cost needs to be part of the conversation throughout the process. The real question is how much confidence should be attached to the number at each stage.
Perhaps the problem is not early pricing at all
Maybe the problem is what we expect an early price to tell us. Early costing should answer a broad question: are we heading in the right direction? Later pricing should answer a much more specific one: what is this particular project likely to cost to build? Those are two different questions, and if everyone understands which one is being answered, early contractor involvement becomes extremely useful. The trouble starts when one is mistaken for the other.
Where we land
So, can you price something that has not been fully designed yet? Yes, but you are pricing assumptions as well as information. That is not necessarily a bad thing, provided everybody understands what the number actually represents. An early figure can protect a project from heading too far beyond the budget. It can influence design decisions and bring valuable construction knowledge into the process. At the same time, the earlier the price, the greater the uncertainty. As the design develops, assumptions are gradually replaced by decisions, and that is when a budget starts becoming a price.
The key is to be aware. Architects can make an informed guess as to the value of a project and often have to in order to be able to give you a fee in the first place based on the RIBA fee scales, but they are not Quantity Surveyors, that value will not be definitive. The same goes for a builder’s estimate. We always advise that there is a possibility of the design exceeding the budget but cannot stress enough that we, as an architectural practice will be there to value engineer that design with you where necessary. With all that being said, approaching a contractor for a estimate early on is somewhat sensible, but as long as you keep in mind that it is just that, an estimate.
Get in Touch
This is something we come across all the time on projects of all shapes and sizes in Huddersfield, across Kirklees and throughout Yorkshire, as well as further afield. We help guide clients through the process and make sure the right information is in place at the right stage. We work with experienced Quantity Surveyors who can provide detailed cost advice earlier on in the process to firm up the figures. If you are planning a project and want to understand when to start talking about cost, get in touch.